While the daily capacity of the plant is 6400 m³ all requirements within the Environmental Law and the Related Regulations was met as soon as the plant was completed. Thus, the disposal problem of the participants arising from the wastewater pollution has been carried from individual solutions to common solutions. The efficiency of the facility, which consists of physical, chemical, biological treatment, sludge drying and deodorization units, can be monitored daily and confirmed by analysis conducted every 15 days within the scope of the Environmental permit.
Contact Person: Salif Kuru / Phone : +90 (262) 648 48 31 Click to send message